Metal Bridge in Portimão
EP - Estradas de Portugal, S.A.
Casing execution of the pillars P4 and P5 in a range from 2,5 m below the river bed to about 0,5m above the top of the stone level.
Injection of holes with self-leveling concrete. Placing of protection on the riverbed against pillars erosion. Conducting underwater surveys every 15 days. Daily topographic control of the top of each pillar.
Type:
Infrastructure, Roads and Airports
Country:
Portugal
Location:
Portimão - Algarve
Start date:
2007
Final date:
2008